Just thought I would put up a couple more pics of the new battery locker and main switch set up to make it clearer as to what I was trying to achieve. It’s fitted in really well and should lower the center of gravity a bit from where they were housed before. All looks much cleaner too. There’s a short, boring film about this work on my youtube channel if you’re a real sucker for punishment. (shoestringsailor)

Quarter berth painted and given over to new battery storage duties. (See new ply shelf in bottom.)

Quarter berth locker painted and given over to new battery storage duties. (See new ply shelf in bottom.)

Battery in it's box and strapped down in position. Same thing in the opposite locker.

Battery in it’s box and strapped down in position. Same thing in the opposite locker.

Old battery locker repaired, painted and fitted with changeover switch and storage tray thingy.

Old battery locker repaired, painted and fitted with changeover switch and storage tray thingy.

Much more like sense this, think I'm going to fill this locker with emergency cherry bakewells.

Much more like sense this, think I’m going to fill this locker with emergency cherry bakewells.